BioShock Wiki

Operations Sign.png

2,300pages on
this wiki
Add New Page
Add New Page Talk0
Full resolution(1,490 × 398 pixels, file size: 437 KB, MIME type: image/png)


Copyright This image was taken from the BioShock video game series or from websites created and owned by 2K Games, the copyright of which is held by Take-Two Interactive Software, Inc. All trademarks and registered trademarks present in the image are proprietary to Take-Two Interactive and its subsidiaries.

The use of images to illustrate articles concerning the subject of the images in question is believed to qualify as fair use under United States copyright law, as such display does not significantly impede the right of the copyright holder to sell the copyrighted material and is not being used to generate profit in this context.

Uses Sign_Base and Sign_Face with Sign_Face_Operations_Diffuse.tga

Appears on these pages

  • Climate Control

    Climate Control is a section of Ventilation Control in Minerva's Den. It is the center of the...

  • Core Access

    Core Access is the last section of Operations, located past Ventilation Control. It leads...

  • Exhaust Venting

    Exhaust Venting is a maintenance area located near Climate Control in the Operations area of...

See full list >

File history

Click on a date/time to view the file as it appeared at that time.

current04:54, February 15, 2015Thumbnail for version as of 04:54, February 15, 20151,490 × 398 (437 KB)UpgradeTech (Talk | contribs)The only sign of Operations is in the Minerva's Den level above the elevator. It is gray instead of red.
05:14, February 14, 2015Thumbnail for version as of 05:14, February 14, 20151,296 × 344 (382 KB)UpgradeTech (Talk | contribs)Uses Sign_Base and Sign_Face with Sign_Face_Operations_Diffuse.tga


Also on Fandom

Random Wiki